MaterialSizer
03 30 00Cast-in-place concrete

Concrete slab calculator

Slab size in, shopping list out: ready-mix by the yard or bags for small pours, plus the forms to hold it.

Measurements

Concrete slab calculator inputs
Length12′ 0″
Width12′ 0″
4″ (10 cm) for patios and walks, 5–6″ for driveways
Coverage and waste
Covers uneven subgrade and spillage

Materials schedule

1.78 cu yd of concrete · 12′ 0″ × 12′ 0″ × 4″ slab

144 sq ftarea 12′ 0″ 12′ 0″
Plan4″ deepNot to scale

How this calculator works

It multiplies length by width by thickness to get the slab volume, adds a waste allowance for an uneven base and spillage, and converts the result to what you can buy: whole cubic yards of ready-mix, or bags when the pour is 1 cu yd (0.75 m³) or less.

Bag counts use standard published yields: an 80 lb bag makes about 0.60 cu ft, a 60 lb bag 0.45 and a 40 lb bag 0.30. Metric bags make about 12 L per 25 kg. Form boards are sized to be at least as deep as the slab.

volume (cu ft) = length × width × thickness (in) ÷ 12
cu yd = volume ÷ 27 × (1 + waste)
bags = volume × (1 + waste) ÷ bag yield

Worked example

A 12′ × 12′ patio 4″ thick holds 12 × 12 × 4 ÷ 12 = 48 cu ft, which is 1.78 cu yd. With 10% waste that is 1.96 cu yd, so the list orders 2 cu yd of ready-mix. The forms take four 2×6 boards 12′ long and 20 stakes, one every 3 ft plus the corners. Bagged, the same pour would be 88 bags of 80 lb.

Tips before you buy

Questions

How thick should a concrete slab be?
Four inches is standard for patios, walkways and shed floors. Driveways and slabs that carry vehicles are usually 5 to 6 inches. Check your local code for garages and structural slabs.
Should I use bags or order ready-mix?
Bags make sense up to about 1 cubic yard, which is already 45 bags of 80 lb to mix by hand. Beyond that a ready-mix truck is faster and gives one consistent batch. The Buy as field lets you force either option.
How many 80 lb bags are in a cubic yard?
An 80 lb bag yields about 0.60 cubic feet, so a cubic yard (27 cu ft) takes 45 bags. With 60 lb bags it is 60 bags, and with 40 lb bags 90.
Why add a waste allowance?
Subgrades are never perfectly flat, forms flex slightly, and some concrete stays in the wheelbarrow or chute. Ten percent is a common allowance; a well-graded, compacted base can get by with five.